The following is the list of power plants with PPA under a process of termination issued by PT PLN during a parliamentary hearing on Tuesday.(ed)
| No. | Name of power plants | Region | Type | Capacity (MW) | Developer | Next Progres |
| 1. | Kuala Tungkal | Sumatera | PLTU | 2 x 7 | PT. ZUG Industri Indonesia | Now under process of terminating contract. Replacement: developing PLTG/MPP Tanjung Jabung 30 MW, Planned operation 2018 and development of GI in the region. |
| 2. | Ipuh Seblat | Sumatera | PLTU | 2 x 3 | Consortium of Amarta Karya (Persero), Pt. Rimbanusa Pikantimnas | Now under process of terminating contract. Replacement: developing PLTG/MPP Muko Muko 30 MW which is now under preparation for tender, planned operation 2018 and development of GI in the region. |
| 3. | Tembilahan | Sumatera | PLTU | 2 x 5,5 | PT. Eksploitasi Energi Indonesia | Already terminated. As replacement will be development of PLTG/MPP Tembilahan 30 MW. Planned operation 2018 and development of GI in the region. |
| 4. | Raha | Sulawesi & Nusa Tenggara | PLTU | 2 x 3 | PT. Hutama Karya (Persero) | Replaced with GI 150 KV/20 Kv capacity 60 MVA, target of COD in 2018 |
| 5. | Wangi Wangi | Sulawesi & Nusa Tenggara | PLTU | 2 x 3 | PT. Hutama Karya (Persero) | To be replaced with PLTMG/G capacity 5 MW which is under tender process and target of COD 2017 |
| 6. | Kaltim (FTP 2) | Kalimantan | PLTU | 2 x 100 | Pt. Graha Power Kaltim | Under process of verifying documents of financing date. Target of Financing verification by end of January 2017 |
| 7. | Kalsel (FTP 2) | Kalimantan | PLTU | 2 x 100 | PT. Tanjung Power Indonesia | Under process of achieving financing date with target of Financing Close on Jan.24, 2017, but still awaiting government guarantee. |
Source: PT. PLN |
||||||