Monday, 15 December 2025Log inRegister
Petromindo
Coal Map 2025
  • News
  • Archive
  • Products
  • Job Gallery
  • Tender
  • Events
  • Ecobiz.asia
  • CoalMetal Asia
  • GIS
  • Regulations
  • More

Tanah Laut wind power project delayed amid permitting setbacks

Monday, September 8 2025 - 08:56 AM WIB

By Bernard Loebs The commercial operation date COD for the MW Tanah Laut wind power project... Log in to read the story
Login
Share this story

Tags:

powerwind powerwind power indonesiawind power project Indonesia
Related News & Products

Cirebon's first wind power plant to begin construction in 2026

PLN plans wind farm in Rote Island, installs meteorological mast

PLN delays auction for South Sulawesi wind power projects

Pertamina NRE eyes wind power projects in Portugal

Shanghai Electric installs first wind turbine at IWIP

Indonesian Geothermal Book 2025/2026

Indonesian Geothermal Report 2023

Indonesian Hydrogen & Ammonia Projects Map 2023

Barito Renewables eyes PLN wind power project tender

Indonesian Methanol Report 2023

EGR
© 2000-2025 Petromindo. All Rights Reserved. See Disclaimer and Refund Policy for details.
Encountering errors, unworking button or bugs in this website, report to: fix@petromindo.com

All material appearing on the Petromindo website (“content”) is protected by copyright under Copyright laws and is the property of Petromindo or the party credited as the provider of the content. You may not copy, reproduce, distribute, publish, display, perform, modify, create derivative works, transmit, or in any way exploit any such content, nor may you distribute any part of this content over any network, including a local area network, sell or offer it for sale, or use such content to construct any kind of database. You may not alter or remove any copyright or other notice from copies of the content on Petromindo’s website. For permission to use the content on the website, please contact marketing@petromindo.com