TJPC: PQ invitation for coal procurement for Tanjung Jati A - 2 x 660 mw coal fired power plant
Saturday, August 13 2016 - 03:22 AM WIB
PT Tanjung Jati Power Company ("TJPC") invites companies holding:
- valid CCoWs (Coal Contracts of Work) / IUPK (Special Mining Business License / izin Usaha Pertambangan Khusus) or
- IUP-OP (Production Operation Mining Business License/ Izin Usaha Pertambangan Operasi Produksi) or
- IUP-OPK (Production Operation Mining Business License specifically for Transportation and Sales/lzin usaha Pertambangan Operasi Produksi Khusus untuk Pengangkutan and Penjualan)
to participate in the prequalification of coal procurement exercise for the Coal Fired Power Plant Tanjung Jati A - 2 x 660 MW at Cirebon, West Jawa, with the coal specification as per the tables below. Indicative quantities being sought are 4.0 - 5.0 million metric tonnes of coal per annum expected to commence in 2020:
Primary and Secondary Supply of Coal
| Parameters | Units | Min Range | Max Range |
| Higher Heating Value (as received) | kCal/kg | 4,100 | 4,300 |
| Total Moisture (as received) | % by weight | - | 35.5 |
| Inherent Moisture (air dry basis) | % by weight | - | 21.5 |
| Sulphur (as received) | % by weight | - | 0.45 |
| Hardgrove Grindability Index | 48 | 70 | |
| Coal Sizing | |||
| <70 | % | 100 | - |
| >50 | % | - | 10 |
| <3 | % | - | 40 |
| <2 mm | % | - | 30 |
| Ash (as received) | % by weight | - | 5.55 |
| Ash Fusion Temperature
(Initial Deformation) - Reducing |
?C | 1,100 | - |
| Volatile Matter (as received) | % by weight | 29.45 | 35.66 |
| Fixed Carbon (as received) | % by weight | 29.06 | 34.2 |
Interested parties are invited to contact the following persons no later than 1700hr WIB on 19th August 2016 to request for a detailed copy of prequalification documents:
? Mr. Chin Pak Seong (pakseong.chirs@ytl.com.my or hp +65 9115 4318)