Wednesday, 03 June 2026Log inRegister
Petromindo
National Korea Maritin University
  • News
  • Archive
  • Products
  • Job Gallery
  • Tender
  • Events
  • Ecobiz.asia
  • CoalMetal Asia
  • Survey
  • GIS
  • Regulations
  • More

Showing "6" post tagged with "Tangguh LNG project".

Saipem completes sailaway of CCS-linked structure for Tangguh LNG project

June 3, 2026

Tangguh targets 180 LNG cargoes in 2026

January 18, 2026

NYK appoints first Indonesian captain for LNG carrier serving Tangguh project

December 10, 2025

BP secures POD approval for Ofaweri Gas Field

December 4, 2025

bp plans Tangguh turn around in 2026

November 12, 2025

BP conducts scheduled turnaround at Tangguh Train-3

August 26, 2025

  • Previous
  • 1
  • Next
IMVC-2026SPE/IADC Asia Pacific Drilling Technology(BPN) Mining Indonesia 2026(JKT) Electric & Power Indonesia 2026(JKT)-Mining-Indonesia-2026(JKT) Oil & Gas Indonesia 2026Indopacific LNG Summit
© 2000-2026 Petromindo. All Rights Reserved. See Disclaimer and Refund Policy for details.
Encountering errors, unworking button or bugs in this website, report to: fix@petromindo.com

All material appearing on the Petromindo website (“content”) is protected by copyright under Copyright laws and is the property of Petromindo or the party credited as the provider of the content. You may not copy, reproduce, distribute, publish, display, perform, modify, create derivative works, transmit, or in any way exploit any such content, nor may you distribute any part of this content over any network, including a local area network, sell or offer it for sale, or use such content to construct any kind of database. You may not alter or remove any copyright or other notice from copies of the content on Petromindo’s website. For permission to use the content on the website, please contact marketing@petromindo.com